PREFEASIBILITY STUDY FOR GAS TRANSPORT AND PROCESSING

PETROSTAR S.A. > Other Projects > PREFEASIBILITY STUDY FOR GAS TRANSPORT AND PROCESSING

PREFEASIBILITY STUDY FOR GAS TRANSPORT AND PROCESSING TO CHEMCHEMAL - ZAHKO - IRAK

(cumullated capacity 1.500.000 St bbl/day)
Start Date: 2007 – Completion Date 2014

The project scope was to study the recovery possibilities for free and associated gas extracted from Kurdistan region from the fields:Kirkuk (Baba Dome and  Adanah Dome), Khurmala Dome, TaqTaq, Howler, DemirDagh, Zab Dome, Chia Surkh, Pulkhana, Bai Hassan, Khabbaz plus the forecast production of other 6 structures with crude oil and associated gas perspectives (Barda Rash, AinSafra, Bashiqa, Maqlub, Basakhrah and Khurmala).